Skip to content
Wright Brothers

Service 05

In Dubai the garden is only usable if it is designed to be. Shade, air movement, water and the right palette of plants turn eight unusable months into eight comfortable ones.

Programme
4 — 9 months
Investment
From AED 750K
Best for
Villa owners whose interiors are done and whose grounds are not

01What makes the difference

01

Shade before furniture

We model the sun path across the day and the year, then place structures where they earn their cost. Comfort comes from geometry, not from a parasol.

02

Planting that survives August

A palette weighted to native and adapted species, on a properly zoned irrigation system, with a maintenance plan handed over on day one.

03

The pool is a building

Structure, waterproofing, balance tank, plant room and circulation are engineered to the same standard as the house.

02Scope

This list is the contract's table of contents. If something you expect is not on it, ask us before you sign — not after.

01

Site survey, levels and drainage strategy

02

Landscape masterplan and planting schedule

03

Pool design, engineering and plant room

04

Shade structures, pergolas and outdoor kitchens

05

Hardscape, lighting and irrigation

06

Twelve months of establishment maintenance

Next step

An hour, at your property or at our studio in Al Barsha First. You leave with a written summary of the brief, an indicative range with its assumptions stated, and an honest view on whether we are the right firm for it.

Response
Within one working day