
Dubai
MEP Works — Sterling Perfumes, Armaf
MEP works including the installation of a 10-ton air-conditioning outdoor unit

Service 03
A kitchen or bathroom is the densest piece of construction in a home: water, waste, power, ventilation and joinery all meeting in a few square metres. We rebuild them from the substrate out, not from the surface in.
01What makes the difference
Every wet area is tanked, flood-tested and photographed before a single tile is laid. We hand you the test records at completion.
Critical junctions — the mitre on a stone waterfall, the shadow gap under a vanity — are drawn full size and dry-assembled in the workshop before delivery.
Phased programmes, dust screens and negative-pressure extraction mean the rest of the home stays usable.

02Scope
This list is the contract's table of contents. If something you expect is not on it, ask us before you sign — not after.
Measured survey and existing services investigation
Layout design, elevations and full joinery drawings
Waterproofing, falls and drainage re-engineering
Bespoke joinery manufactured to the millimetre
Stone, tile and metalwork supply and installation
Appliance integration, testing and commissioning
Five-year workmanship warranty on all wet areas
03Seen in practice

Next step
An hour, at your property or at our studio in Al Barsha First. You leave with a written summary of the brief, an indicative range with its assumptions stated, and an honest view on whether we are the right firm for it.