Skip to content
Wright Brothers

What we do

Whichever you need, the same team designs it, prices it, permits it and builds it. There is never a second company involved, and never a second number to call.

019 — 14 months

Most Dubai villas were built to a developer's schedule, not to a family's life. We strip back to what is worth keeping, re-plan the way the house is actually used, and rebuild it to a standard the original never had.

Typically
9 — 14 months
Investment
From AED 2.4M
Best for
Owners of a villa in a settled community who intend to stay

0216 — 24 months

A plot is a rare thing in Dubai and it deserves better than a catalogue house. We design to the site — its orientation, its prevailing wind, its view lines — and then we build what we drew.

Typically
16 — 24 months
Investment
From AED 6M
Best for
Owners of a plot in Emirates Hills, Al Barari, District One or similar

0310 — 18 weeks

A kitchen or bathroom is the densest piece of construction in a home: water, waste, power, ventilation and joinery all meeting in a few square metres. We rebuild them from the substrate out, not from the surface in.

Typically
10 — 18 weeks
Investment
From AED 320K
Best for
Owners upgrading a single high-value room without a full renovation

046 — 11 months

Tower work is a different discipline: building management approvals, restricted access hours, service lifts and acoustic separation. We have the systems for it, and the relationships with the management companies who gate it.

Typically
6 — 11 months
Investment
From AED 1.6M
Best for
Owners of penthouses and large apartments on the Palm, Downtown or Marina

054 — 9 months

In Dubai the garden is only usable if it is designed to be. Shade, air movement, water and the right palette of plants turn eight unusable months into eight comfortable ones.

Typically
4 — 9 months
Investment
From AED 750K
Best for
Villa owners whose interiors are done and whose grounds are not

065 — 10 months

This is the work that sits between architecture and decoration: the built-in that hides a structural column, the reveal that makes a ceiling float, the stone junction nobody notices because it is right.

Typically
5 — 10 months
Investment
From AED 900K
Best for
Owners whose structure is sound but whose interior is not theirs

07Technical services

The same in-house teams that finish our own projects are available for maintenance and standalone work — for houses we have built, and for those we have not.

01

Electrical Works

Circuits, distribution boards, lighting and power — tested, labelled and made good afterwards.

02

Plumbing Services

Leaks, blockages, sanitaryware and pipework, traced to the cause rather than the symptom.

03

AC Installation & Maintenance

Split and ducted installation, servicing, gas charging, duct cleaning and condensate clearing.

04

Painting Services

Interior and exterior decoration, with the preparation that decides how long the finish lasts.

05

Carpentry & Woodwork

Fitted wardrobes, doors, shelving and repairs, measured and scribed to the actual opening.

06

Gypsum Ceiling & Partition

False ceilings, partitions, bulkheads and coves, with access panels where they will be needed.

07

Tile & Flooring Works

Floor and wall tiling, vinyl and laminate, over substrates levelled and waterproofed first.

08

General Maintenance

Multi-trade repairs and ongoing upkeep under a single point of contact and one invoice.

Not sure which

Tell us what the house is and what is wrong with it. We will tell you which of these it actually needs — including, sometimes, none of them.

Start a conversation

An hour, at your property or at our studio in Al Barsha First. You leave with a written summary of the brief, an indicative range with its assumptions stated, and an honest view on whether we are the right firm for it.

Response
Within one working day